Green energy

Bommelaere Wind Farm

Eoly Energy, Aspiravi NV and Storm are looking into the possibility of co-developing a wind farm along the E40 motorway (between the Nieuwpoort and Oostduinkerke junctions) and the Veurne-Nieuwpoort channel. The project is currently only in the exploratory phase. Certain spatial and environmental aspects require further research. The plan is to build 18 wind turbines with a capacity of 5,6 MW each – enough to provide 81.200 families with green energy for an entire year.
Wind Turbines
0
TOTAL HEIGHT
1 m
Construction start
Exploratory phase 0
MW/wind turbine
0
TOTAL SAVED CO2 / YEAR
10000 ton
Ready for use
Exploratory phase 0

Always looking for suitable locations

Do you own a plot of open land in an agricultural or industrial area, or an industrial building with a spacious but unused roof? Your property could be the ideal spot for a wind turbine or solar panels, thereby literally helping you build a greener energy landscape for future generations. Get in touch and we will look into your proposal, no strings attached. 

Windmolen Spy 031

Frequently asked questions

How green is wind energy?
Do turbines generate more energy than their construction requires?
Does a wind turbine affect local fauna and flora?