Green energy

Bassilly Wind Farm

Eoly is planning a new wind farm at the A8 – E429 motorway with four wind turbines. This location is in an agricultural area and respects all the conditions of the legislation.

The wind park is located in the neighbourhood of the wind parks Ghislenghien, Ollignies and Halle. Eoly Energy invests here also in sustainable, local energy production.
Wind Turbines
0
TOTAL HEIGHT
1 m
Construction date
June 2022 0
MW/wind turbine
0
TOTAL SAVED CO2 / YEAR
1000 ton
Ready for use
dec 1000
Eoly_Co_5

Join Eoly Cooperative in Investing in the Future!

As a member-owner, you will be helping to build Belgium’s future energy landscape. In return, you get a say in our projects and a share of the profits from our wind turbines. What’s more, wind is worth a lot! Eoly Cooperative aims for a return of around 4%. This is more than what you would get from a savings account. Then, should you change your mind, you can pull out any year.  

Always looking for suitable locations

Do you own a plot of open land in an agricultural or industrial area, or an industrial building with a spacious but unused roof? Your property could be the ideal spot for a wind turbine or solar panels, thereby literally helping you build a greener energy landscape for future generations. Get in touch and we will look into your proposal, no strings attached. 

Eoly_Verkoop

Frequently asked questions

How green is wind energy?
Do turbines generate more energy than their construction requires?
Does a wind turbine affect local fauna and flora?